R and V Works FF6 Informations techniques Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 80
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
Compressor Application Manual
36
14 - Soldering rods;
15 - Brazing flux;
16 - Vacuum gauge;
17 - Oxy-acetylene or axi-gas welding equipment;
18 - Device for checking electricity range
(multimeter, test lamp and others);
19 - Pressure/hose analyzer with retention valve;
20 - Connectors/fast couplings/hoses with manifold;
21 - Universal pliers;
22 - Small clamp
2 - How to remove a used compressor
We recommend that the used refrigerant fluid is
collected for later recycling or incineration,
according to the following procedure:
First, install a perforating valve in the
compressor process tube. Connect the
perforating valve to the recovery equipment
that is then connected to the receiving cylinder.
Now just connect the recovery equipment.
Open the receiving cylinder valve and then the
perforating valve.
It is very important to keep the recovery
equipment operating as long as it is necessary
to collect all refrigerant. The duration of this
process will depend on the equipment used
and refrigeration system.
Loosen the points where the compressor is fixed
to the system;
V
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 79 80

Commentaires sur ces manuels

Pas de commentaire